CSR Delivered Low-side Gondola Vehicles to Namibia Ahead of Schedule

2012-06-01 10:55:00
Summary:Recently, the low-side side-wall gondola vehicles designed and manufactured by China South Locomotive Yangtze were successfully delivered to Namibia ahead of schedule.
Recently, the low-side side-wall gondola vehicles designed and manufactured by China South Locomotive Yangtze were successfully delivered to Namibia ahead of schedule.
The project started on October 8, 2011. Through five stages of product design, technical preparation, prototype trial, mass production and delivery, the project was successfully checked and accepted on May 3, 2012, ahead of the contract schedule. Namibian Rail was satisfied with the product quality.
Namibia low-side side-wall gondola vehicle is the first truck produced by Wuhan Division of CSR Yangtze River exported to African markets, and another move for CSR Yangtze to expand overseas railway truck market. Therefore, after winning the order, Wuhan Division leadership of CSR Yangtze River attached great importance, and made the decision to start mass production of Namibia vehicles in advance due to the arduous tasks of national railway cars and export cars in the first quarter of this year. The company also set up an internal supervision team to strictly control the quality.

Ally Information

World Railway Magazine

E-Magazine weekly

Set home | Favorites | About Us | Advertising | Contact Us | Copyright | sitemap

Copyright2004-2014 ? Beijing Ally Information Inc.All rights reserved