Metro Line 2 section tunneled in Guiyang

2017-09-13 16:18:00
Summary:After nine months of construction, the section of Metro Line 2 connecting West Lincheng Road and West Guanshan Road has been successfully tunneled in Guiyang
After nine months of construction, the section of Metro Line 2 connecting West Lincheng Road and West Guanshan Road has been successfully tunneled in Guiyang, local media reported on Sept 12.

The tunnel, designed as a double-track single line, stretches 952.35 meters. A number of complicated engineering techniques in were employed during the construction to ensure the stability and safety of the underground landscape.

Metro Line 2 in Guiyang began construction in December 2015. The project is expected to be finished in 2020, stretching 24 stations through the downtown area of the city to the suburb Baiyun district.

Ally Information

World Railway Magazine

E-Magazine weekly

Set home | Favorites | About Us | Advertising | Contact Us | Copyright | sitemap

Copyright2004-2014 ? Beijing Ally Information Inc.All rights reserved